Full Home Renovations
in Naples & Marco Island
Some houses cannot be fixed with new finishes. The kitchen is closed off behind a wall, the primary bath still reflects a 1990s plan, the rooms facing the water are the smallest in the house, or a beautiful lot is carved into dark, narrow spaces. A full home renovation changes the floor plan itself. Bearing walls are removed and replaced with engineered beams, kitchens and baths move to new locations with new plumbing runs, ceilings are raised where the structure allows, and openings to the lanai get wider. It is construction work first and design work second, and it needs a builder who can manage both.
Renovation or remodel: which one you need
We use the terms carefully. A renovation alters the structure: walls, openings, rooflines, room layout. A remodel replaces finishes inside the existing layout. If none of your walls move, a whole-home remodel is the better fit and costs less. If the problem is the plan, finishes alone will leave you with an expensive version of the same layout. One consultation is usually enough to tell which category your project belongs in.
Permits, engineering and the Notice of Commencement
Structural renovation in Naples starts with sealed drawings from a licensed engineer and a building permit from Collier County, the City of Naples or the City of Marco Island, depending on where the home sits. Florida’s construction lien law requires a recorded Notice of Commencement, signed by the owner, for most improvements over 2,500 dollars, and when the direct contract is over 5,000 dollars a copy must be filed with the permit office before the first inspection. On Marco Island it must also be posted on the job site before that inspection. Inspections follow each stage, from framing and rough plumbing to insulation and final. We file, schedule and close every permit, because an open permit can delay a future sale.
Flood zones and the 50 percent rule
Large renovations in coastal Naples have one rule that changes everything if it is triggered. In the City of Naples, when the cost of improvements equals or exceeds 50 percent of the structure’s market value before construction, the building must be brought into compliance with current flood regulations, which can mean raising it to the base flood elevation. The city uses the Collier County Property Appraiser’s value for the structure, excluding land, unless the owner provides a qualifying independent appraisal. Collier County and Marco Island apply similar substantial-improvement rules. The National Weather Service reported that Hurricane Ian’s surge in September 2022 flooded almost all of Collier County south and west of US 41, so many owners are weighing these numbers carefully. We estimate where your project falls before design is finalized, so the scope can be adjusted if needed.
Engineering First.
Finishes Last.
Order matters more in a renovation than in any other project. Engineering is completed before demolition, rough trades finish before drywall, and inspections are passed before any wall is closed. We manage that whole sequence under one general contractor license: engineering coordinated by our office, our own crews on demolition and framing, licensed plumbers and electricians rerouting systems for the new layout, and the same finish standards we use in our kitchens and baths applied to every new room. Before a wall comes down, you approve a photo-real rendering of the redesigned home built from a LiDAR scan, and one fixed price covers everything from engineering to final paint.
Common structural changes
Opening the kitchen to the great room is the most frequent request we get. In many Naples homes the interior walls are wood framed while the exterior walls are concrete block, and an engineer determines whether a wall is bearing and how a beam should carry the load. Other common changes include combining two small bedrooms into a proper primary suite, moving a laundry room out of the garage, enlarging openings to the lanai with impact-rated sliding doors, and raising flat ceilings into trays or vaults where the roof framing allows. Exterior openings must meet Florida’s wind-load requirements, which affects the door and window products we specify.
Older homes and hidden conditions
Renovating a house built several decades ago often uncovers outdated wiring, cast-iron drain lines nearing the end of their life, undersized electrical panels or past water damage. We look for those signs during the first walkthrough and note them in the proposal so they are part of the plan rather than surprises halfway through demolition.
Living through it, or not
Most full renovations take four to eight months, depending on the structural scope and permit timing. Many Naples owners schedule the work while they are away for the summer, and we send photo updates so progress can be followed remotely. If you plan to stay in the home, we phase the work to keep at least one bathroom and a simple kitchen setup available whenever possible. The checklist, cost and older-home guides listed below go deeper on planning.
The Floor Plan,
Redrawn.
Home Renovations Naples Before &
Renovation
FAQs.
What does a full home renovation cost in Naples?
Cost is driven by the structural scope: how many walls move, how far the kitchen and baths relocate, and what the engineering requires. A free LiDAR scan and design consultation lead to one fixed price covering engineering, permits, structure and finishes.
What is the difference between a renovation and a remodel?
A renovation changes the structure, such as walls, openings and the floor plan. A remodel updates finishes while the walls stay in place. This page covers the structural side; our whole-home remodeling page covers finishes.
How long does a full renovation take?
Usually four to eight months, depending on structural scope and permit timing. The schedule is written into the fixed quote, and our own crews handle each phase.
Will my renovation trigger the FEMA 50 percent rule?
It can if the home is in a flood zone and the improvement cost reaches half of the structure’s market value. We estimate that ratio early, using the property appraiser value or an independent appraisal, so you can plan the scope with the rule in mind.
Can we stay in the house during the renovation?
Sometimes, with phasing. For larger structural projects most clients move out or schedule the work while they are away, which shortens the timeline and keeps everyone safer.
Work That Passes
Every Inspection.
Structural shortcuts hide inside walls and above ceilings until an inspector or a storm finds them. We build renovations to be examined: sealed engineering on file, every beam and connection inspected, licensed trades on each system, and permits closed and documented for resale. Blane Perun leads design and selections, Jonathan Corcoran manages production, permits and crews, and the project is rendered before demolition and delivered for one fixed price by a team with more than 500 Southwest Florida remodels and 20 years of property management experience.
The House You Bought.
The Plan You Wanted.
Your free consultation includes a structural walkthrough, candid renovation-vs-remodel guidance, a free LiDAR scan and photo-real render of the new floor plan, and a fixed-price estimate that runs from engineering to finishes.
Plan It Right.
Answers to the questions homeowners ask most, written for Southwest Florida homes.







