St. Laurent at Pelican Bay
Kitchen & Bath Remodeling
St. Laurent stands at 6849 Grenadier Boulevard, a 22-floor tower finished in 1997 with 102 condominiums and five penthouses. Two-bedroom plans begin around 1,470 square feet, and the 01 stack carries three well-separated bedrooms in up to 2,515 square feet. Gulf views open up from roughly the fifth floor, and every stack except the 03 also looks back over Pelican Bay. Owners share a pool, spa, fitness center, library, social room, two tennis courts and two guest suites, with a path to the beach straight off the pool deck. The building got new windows and sliders in 2021 and 2022, so most of what still feels dated sits inside the unit: the kitchen, the baths and the low ceilings under the air-conditioning soffits.

St. Laurent Bathroom Remodel
A late-1990s St. Laurent bath usually has the right size and the wrong finishes. Primary suites in the larger stacks have enough length to trade a tub for a walk-in shower with a bench and still keep two sinks, and guest baths can take a frameless glass enclosure in place of a curtain or framed door. Large-format porcelain or honed stone on the walls cuts down on grout lines, and a heated floor adds little cost once the old tile is up. Most owners keep the toilet and shower where they are and spend the savings on stone, glass and lighting.
Ceilings matter in this building. Standard floors run about 8 feet, dropping a foot where the air-conditioning soffits pass through, while penthouses and first-floor units have 10 feet. Listing notes from the building say those soffit areas can sometimes be raised by up to 8 inches, and we check that against the actual ductwork during the free LiDAR scan before it goes into a plan. The St. Laurent association still reviews the scope, the insurance certificates and the schedule before demo, and sets the elevator bookings and work hours. We swap out the original 1997 shutoff valves and supply lines while walls are open, and pull the Collier County plumbing and electrical permits.
Bathroom remodels at St. Laurent start from $31,000 per bath.
Pick a shower, vanity and stone for your St. Laurent bath in the Pelican Bay Beachfront bathroom builder.
St. Laurent Kitchen Remodel
Kitchens at St. Laurent are larger than the ones in the early-1980s towers down the boulevard, so the job is less about finding space and more about using it. Owners typically replace the original cabinets with full-height runs and deep drawers, extend a counter into a peninsula with stools, and move up to quartzite or a dense quartz with a slab backsplash. In units whose back side faces Pelican Bay, a wider opening between kitchen and family room lets the cook see out both ways. Pull-out pantries, a built-in coffee center and a beverage drawer are frequent add-ons.
Because standard ceilings are about 8 feet, we often run cabinets to the ceiling with a clean crown and keep the lighting flush: recessed fixtures, under-cabinet LED and one or two pendants over the peninsula. Panel-ready refrigeration and InvisaCook, the induction cooktop that sits under the stone, keep the room quiet and uncluttered; Cutting Edge Kitchen & Bath is the exclusive InvisaCook dealer. The LiDAR scan drives a photo-real 3D render, and cabinets and counters are cut to it, which keeps the number of elevator days low. You choose slabs at our Bonita Springs showroom, or we bring samples to your condo.
Kitchen remodels at St. Laurent start from $62,000.

Plan cabinets to the ceiling and a new peninsula for your St. Laurent kitchen in the Pelican Bay Beachfront kitchen builder.
Why St. Laurent Owners Choose Cutting Edge
Cutting Edge Kitchen & Bath runs its Naples work from an office on Tamiami Trail North and keeps a 4,000-square-foot showroom at 28280 Old 41 Road in Bonita Springs, where St. Laurent owners can see full slabs, cabinet doors and tile side by side. We have finished more than 500 remodels across Southwest Florida and earned Best of Houzz nine times. Each project begins with a free LiDAR scan and a photo-real 3D render, moves to one fixed-price contract, and is built by our own crews. We prepare the association submittal, reserve the elevator and keep to the building's work hours from demo to final walk-through.