Naples · Pelican Bay · Port Royal · Marco Island
Tub-to-Shower Conversion Cost: What Drives the Price by Cutting Edge Kitchen & Bath
Tub to Shower Conversion · Naples & Marco Island

Tub-to-Shower Conversion Cost
What Drives the Price

Conversions From
$8.5K
Pricing from our Tub-to-Shower Conversion packages
Design Visit
Free
Photo-real 3D render plus LiDAR scan
Built By
Our Crews
500+ SWFL remodels, licensed Florida GC
By Blane Perun, Owner · Cutting Edge Kitchen & Bath·500+ SWFL remodels · 20 years of property management · Updated October 2026
Quick answer

Five decisions account for most of what you will spend on a tub-to-shower conversion: custom tile or a prefab pan with a wall kit, a curbed or curbless entry, frameless or framed glass, whether the valve or drain must be relocated, and how much waterproofing and tile the walls require. Staying inside the existing tub footprint saves the most. Going curbless, rerouting plumbing through the concrete slab, and including a niche or bench push the number up. Pricing for our conversion packages begins at $8,500.

From our Tub-to-Shower Conversion guide →

Walk-in tile shower that replaced a bathtub in a Naples home
Cutting Edge Kitchen & Bath · Tub-to-Shower Conversion

What Changes the Cost of a Tub-to-Shower Swap?

At its most basic, a conversion pulls out the tub and sets a solid-surface or acrylic pan with wall panels in that same 60-inch alcove, along with new valve trim and a glass door that slides or swings. It goes in fast and leaves few seams to look after. Custom tile runs higher since it calls for a foam tray or mortar bed, a complete waterproofing membrane, tile work on every surface and frameless glass; in return you get niches, benches, bigger formats and whatever finish you want.

Budgets shift with layout changes. The cheapest path keeps the drain right where the tub drain was. A center drain, or a linear one along the wall, involves cutting into the slab, rerouting pipe and patching the concrete afterward. Going curbless also means recessing the floor so the water stays in the shower. Every upgrade, whether body sprays, a rain head, a slide-bar handheld or a thermostatic valve, brings more valves and supply lines with it. Permits, an exhaust fan, lighting and grab-bar blocking fill out the rest of the scope.

Cost driverBudget optionPremium option
Shower basePrefab pan, acrylic or solid surfaceMembrane-lined custom tile pan
WallsPanel kitLarge-format slab or tile to the ceiling
EntryLow curbCurbless over a recessed slab
DrainRemains at the tub drain spotRelocated, or a linear drain added
Valve and fixturesOne valve, one showerheadThermostatic valve plus handheld, rain head and body sprays
GlassSliding door with frameFrameless panel with hinged door
ExtrasNoneNiche, bench, lighting, grab bars
Price Your Conversion.

Look over the tub-to-shower packages in our Good, Better and Best tiers, from a clean panel shower up to a curbless tile build.

What Affects Price in Naples and Collier County?

Since the typical Southwest Florida house is built on a concrete slab, changing a drain means saw-cutting and breaking out concrete, then repouring once the plumbing is in. In high-rise condos, floors are often post-tensioned, with steel cables running through the concrete, and they have to be scanned before anyone cuts or drills. Associations usually want approval, insurance certificates and sometimes sign-off from an engineer before work begins, and they may restrict working hours. Those steps cost time and coordination more than fixtures, but they still belong in the budget.

Most conversions that touch plumbing need a permit, issued by Collier County, the City of Naples or the City of Marco Island depending on your address. Given the humidity, waterproofing is the line item you should not trim: the membrane under the tile is what keeps the drywall and framing behind it dry. A lot of our clients give up their tubs because a walk-in shower gets easier to live with over time, so it makes sense to price a bench, blocking for grab bars and a low or zero curb right from the start. With the free LiDAR scan, we can quote everything as one fixed price.

Frameless-glass curbless shower conversion in Naples, Florida
Cutting Edge Kitchen & Bath · Tub-to-Shower Conversion
Naples, Collier and Marco Conversion Rules

Which Office Permits a Naples-Area Conversion?

Three building departments cover the area where this page applies, and the right one depends on the address, not the mailing city. Inside the City of Naples, permits come from the City’s Building Department at 295 Riverside Circle. Unincorporated Collier County, which includes communities such as Pelican Bay and Vanderbilt, is handled by Collier County Building Plan Review and Inspection at 2800 N. Horseshoe Drive. The City of Marco Island runs its own Building Services department. Those office details come from a permit directory summary, so confirm the jurisdiction for your parcel before you file anything.

People often hope a shower swap qualifies as minor work. In unincorporated Collier, a written exemption request for qualifying small jobs applies only to single-family detached homes, excludes plumbing, mechanical, electrical, gas and structural work, and cannot be used inside a flood hazard area. A separate list of exempt repairs names things like faucets, toilets, sinks, dishwashers, disposals and like-for-like electric water heaters up to a set size. Removing a tub, changing the valve and reworking a drain does not appear on that list. Treat the conversion as permitted work and ask Collier Building to confirm.

Scanning the slab before a drain moves

The cheapest conversion keeps the drain where the tub drain sat. When the plan calls for a center drain or a linear drain, the floor has to be opened, and in a concrete high-rise that is not a casual cut. A concrete scanning company, GPRS, notes that in post-tensioned structures scanners typically find one mat of support rebar near the base of the slab, with post-tension cables running above it and sitting higher near beams and column lines. The same company warns that cutting a cable can cause immediate structural failure that endangers everyone on site. Ground-penetrating radar can usually tell rebar from electrical conduit, and the company marks only areas it is confident are clear.

For an owner, the practical step is to ask the association for the building’s structural drawings and to require a scan before anyone cores, saws or hammer-drills the slab. If the scan shows the new drain location is not available, moving the shower a few inches is far better than discovering a cable with a core bit.

Flood-zone shower walls

Many Naples addresses are in a mapped flood hazard area, and the City of Naples floodplain page says almost all permitted development gets floodplain review. In those areas, FEMA Technical Bulletin 2, revised in January 2025, requires flood-damage-resistant materials below the base flood elevation, meaning materials that can handle direct contact with floodwater for at least 72 hours. The bulletin lists cement board, non-paper-faced gypsum and mortar-set ceramic or porcelain tile as acceptable. It lists paper-faced gypsum board and tile set with organic adhesive as unacceptable. A shower on a ground-level slab below the base flood elevation should be specified with that list beside the tile schedule.

The 50 percent substantial-improvement rule is worth a sentence too. Collier County compares the cost of the work with the market value of the structure, excluding the land, and when the cost reaches 50 percent the whole building must comply with current floodplain rules. A single shower conversion rarely approaches that line, but it counts toward the total when it is part of a larger permitted project. The City of Naples publishes its own floodplain guidance, so ask which office reviews your address.

Planning a roll-in or transfer shower

Some owners convert a tub so they can keep living in the house as they age. The federal 2010 ADA Standards for Accessible Design give a useful reference point, and your building department can say whether any accessibility standard applies to your project. A transfer-type shower is 36 inches by 36 inches clear inside with a 36-inch wide entry. A standard roll-in shower is at least 30 inches wide and 60 inches deep, with an entry on the open face that is 60 inches wide. The second dimension is close to the length of a 60-inch tub alcove, but the entry rule means the full open side of the shower would have no curb or wall, which changes the waterproofing and the floor slope. If accessibility matters, decide it before the contract, not at tile selection. Our walk-in shower cost guide covers the larger layouts.

Noise and schedule matter in the city. The City of Naples noise ordinance, Section 22-37, limits residential construction to 7 a.m. to 6 p.m. Monday through Saturday and demolition to weekdays between 8 a.m. and 6 p.m., and it bars work on New Year’s Day, Memorial Day, Independence Day, Labor Day, Thanksgiving and Christmas. The City page does not define demolition, so ask the City whether interior tub removal falls under the weekday-only limit, and schedule it for a weekday if in doubt.

Where this information comes from

Collier County Building Plan Review and Inspection, PRAD exemption page and Section 22-26 exemptions; permit directory summaries for the City of Naples and unincorporated Collier offices; GPRS, “What Are Best Practices When Cutting or Coring Concrete?”; FEMA Technical Bulletin 2 (January 2025); City of Naples floodplain and noise ordinance pages; and the 2010 ADA Standards, Section 608.2, at ada.gov. Where a summary rather than the primary page was used, confirm with the building department.

Conversion Cost Questions

Does keeping the shower in the tub space cost less?

Yes. Reusing the existing alcove and drain location means no slab cutting or pipe rerouting, two of the bigger expenses in a conversion. A typical 60-inch tub alcove turns into a comfortable shower. You can enlarge the footprint, but framing, plumbing and tile costs will climb.

Do you need a permit for a tub-to-shower conversion?

In most cases, yes. Swapping a tub for a shower usually includes plumbing changes like a new drain or valve, and most local building departments treat that as permitted work. Condo associations layer on their own approval process. We pull the permits and take care of association paperwork as part of the job.

Will taking out my only tub hurt resale?

Buyers with young children may care, so many owners keep at least one tub somewhere in the house. As long as a secondary or guest bath still has a tub, converting the primary bath to a big walk-in shower is a common move, and Southwest Florida buyers often like it.

Which office permits a tub-to-shower conversion in Naples, Collier County and Marco Island?

It depends on the address. The City of Naples Building Department handles parcels inside city limits, Collier County Building Plan Review and Inspection handles unincorporated areas, and the City of Marco Island has its own Building Services department. Confirm the jurisdiction for your parcel with the department before you file.

Can a shower conversion skip a permit as minor work in Collier County?

Probably not. Collier written exemptions for small jobs exclude plumbing work, and the list of exempt repairs names faucets, toilets, sinks and similar like-for-like swaps rather than a new valve and drain. Ask Collier Building to confirm for your scope.

Should a condo slab be scanned before a shower drain moves?

Yes, where the floor is post-tensioned. A concrete scanning company reports that cutting a post-tension cable can cause immediate structural failure, so ask the association for drawings and require a scan before any coring or sawing.

What wall materials suit a shower below flood elevation?

FEMA Technical Bulletin 2 (January 2025) lists cement board, non-paper-faced gypsum and mortar-set ceramic or porcelain tile as acceptable flood-damage-resistant materials, and paper-faced gypsum and tile set with organic adhesive as unacceptable. Check which applies to your zone with the building department.

How big is a shower designed for wheelchair users?

The 2010 ADA Standards give a transfer shower as 36 by 36 inches clear with a 36-inch entry, and a roll-in shower as at least 30 by 60 inches with a 60-inch wide open entry. Use them as a reference and confirm with the building department whether any standard applies to your project.

Swap the Tub Out.

We scan the bathroom, render your new shower and quote one fixed price with permits included.

Bathroom Owners Choose Cutting Edge

A tub-to-shower conversion may look simple, yet whether it holds up depends on the slab, the waterproofing and the condo paperwork. Cutting Edge Kitchen & Bath holds a Florida general contractor license and serves Naples and Marco Island from our Naples office, with nine Best of Houzz awards and over 500 Southwest Florida remodels completed. You can see tile, glass and fixtures in our 4,000-square-foot Bonita Springs showroom (28280 Old 41 Road). Each conversion begins with a photo-real 3D render built from a free LiDAR scan, and our own crews finish it under one fixed-price contract, without surprise change orders along the way.

📞 (239) 237-7000 Book Free Consult →
10 AI Tools · Free After Consultation

Your Naples & Marco Island
Remodel Tools.

AI room previews, neighborhood comp data and Naples market numbers, made for homeowners in Naples and on Marco Island. These tools charge $14–$36/month elsewhere. You get them free after your consultation.

01
AI Room Visualizer
Upload a photo. See your kitchen or bath transformed in 30 seconds in any style, any material.
Photo → AI Render
02
Naples Style Matchmaker
6 questions. A personalized design profile with AI renders at every price tier.
Style Profile
03
InvisaCook Visualizer
See any kitchen without a visible cooktop. Authorized exclusive dealer — the only tool of its kind.
Exclusive to South Florida
04
Cabinet Visualizer
Swap door styles, finishes, and paint colors from our actual showroom catalog onto your kitchen.
Product Visualization
05
Countertop Visualizer
See Cambria, Dekton, quartzite, and marble options applied directly to your kitchen photo.
Material Selection
06
Paint Color Visualizer
Repaint any room in seconds — every wall, any color, photo-real light and shadow.
Color Selection
07
Flooring Visualizer
Swap tile, LVP, and wood floors into your rooms — laid in the right direction, at the right scale.
Material Selection
08
Bathroom Visualizer
Tub-to-shower conversions and full bath restyles rendered on your actual bathroom photo.
Photo → AI Render
09
Outdoor Kitchen Visualizer
Turn your lanai photo into a full outdoor kitchen — grills, stone, bar seating, lighting.
Photo → AI Render
10
Bonus Room Converter
Empty spare room in — office, gym, media room, or guest suite out. Four futures, one photo.
Room Conversion
Access all 10 tools — free with your consultation.
90-day access · 50 renders · Watermarked for sharing · No subscription
Unlocked after your
free planning session
Book Free Consult →