Every Room.
One Team, One Contract.
On Marco Island, a condo renovation usually turns into a relay of unrelated trades — flooring one month, a painter after that, the kitchen installer whenever the cabinets finally ship. We are doing the reverse at The Sandcastle. One residence at 720 S Collier Blvd is moving through kitchen, baths, floors, paint, and the full interior finish as one managed project, with a single timeline and a single fixed price.
Working on the island brings its own rules: elevator bookings, association work hours, and materials staged in order so the unit is never left waiting on a back-order. With twenty years in property management and 500+ remodels across Southwest Florida behind us, the sequence is planned before any trade arrives — the same system we use on twelve units at Eden House, applied here to one.
A 1983 Tower on the Sand.
The Upside Is Inside.
Sandcastle I (1982) and Sandcastle II (1983) rise sixteen stories at the southern end of Marco Island’s crescent beach. The towers are known for their glass elevators, wrap-around lanais that rank among the biggest on the island, and floor plans running from 863 to nearly 2,000 square feet. Four decades later, the location is still one of the strongest beachfront addresses in Southwest Florida — and no remodeling budget can recreate a spot on the sand.
Here is why the math works. Even at the smallest end — one-bedroom, 863-square-foot plans — fully renovated Sandcastle units are listed between $729,000–$790,000, better than $840 a square foot. Untouched units in the same stack, with an identical beach and view, sell for well under that. In a 1983 building the sand and the view never change; only the interior does. A whole-house renovation is the step that takes a unit from dated 1980s pricing to the top of Marco Island’s per-square-foot range, and it is the reason our client chose to do it.
Wall to Wall —
Floor to Ceiling.
The kitchen is rebuilt from the slab up, with cabinetry staged at our 4,000 SF Bonita Springs warehouse, stone countertops, and a new appliance package. Both baths become full wet rooms: tiled walk-in showers, new vanities, and complete waterproofing behind every wall. Every room gets new flooring, rated for moisture in a beachfront setting and laid tight over a prepared slab.
Every surface is repainted, doors and trim are replaced, and fixtures and lighting are updated room by room. Then comes the punch list — the careful closeout that turns a job site back into a finished home on the beach. We add new photos to this page as each room is completed.
Choosing finishes for a beachfront unit. A Gulf-front condo that may be rented for part of the year needs finishes that are attractive on day one and still look good after several seasons of guests. That usually points to porcelain tile in wet areas because it absorbs little water and cleans easily, quartz or well-sealed stone on counters, cabinet hardware and plumbing trim with solid-brass bodies that resist salt air, and flooring rated for moisture. Light, neutral backgrounds keep the focus on the view, while one or two richer materials, such as a stone feature wall or a statement light fixture, give the unit a character that stands out in listing photos.
What the owner decides before work begins. The smoothest condo renovations are the ones where decisions are made early. Before demolition, the owner approves the layout in a photo-real rendering created from a LiDAR scan, chooses cabinetry, stone, tile and fixtures in person at our showroom, and confirms the target completion date. With those choices locked, materials can be ordered and staged, the association can be given a firm schedule, and the fixed contract price reflects the actual selections rather than allowances.
How the work is sequenced. A whole-unit condo renovation runs in a fixed order so no trade waits on another. Protection goes down first in the hallway and elevator, then demolition, then rough plumbing and electrical while walls and floors are open. Waterproofing and the shower pans follow, each pan filled with water and checked before tile. Flooring, cabinetry and stone come next, then trim, doors, paint and fixtures, and finally the punch list and a cleaning. Ordering materials in advance and staging them at our Bonita Springs warehouse keeps that chain moving instead of stalling on a late delivery.
Permits on Marco Island. Unit remodels in multi-family buildings are permitted through the City of Marco Island, whose application asks for a detailed scope of work, a floor plan of the unit, a floor plan of the building showing the work area and any floor penetrations, and UL listings for fire-rated assemblies and penetrations. A Notice of Commencement must be recorded and posted at the job site before the first inspection. We prepare that package, coordinate inspections with the building’s access rules and close the permit at the end, so the owner has a clean record when the unit is rented or sold.
Working inside an older tower. Buildings from the early 1980s have their own quirks: drain stacks shared by every unit in the column, concrete slabs that cannot be cut without engineering, and walls that may hide risers. We plan the new kitchen and baths around existing drain locations, use sound-rated underlayment beneath hard flooring so neighbors below are not disturbed, and confirm what is inside a wall before moving it. Florida’s 2022 condominium safety law also introduced milestone structural inspections for condo buildings three stories and taller, and building-wide projects that follow can affect when interior work is scheduled, so we check the association calendar before setting dates.
The Sandcastle Whole-Residence Renovation Before &
Questions We Hear Most.
Want Your Unit
Done Next?
Whole-house condo renovations across Naples, Marco Island, and the rest of Southwest Florida — one crew, one timeline, one fixed contract.










